DOI: 10.11799/ce201310016
Study on Water Inrush Prevention Technology of Temporary Coal Bunker Construction
WANG Hao
Keywords:temporary coal bunkerthickness of safety aquifugecoring surveywater drainage testdrainability
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 46-48 )
