Prediction on Inactive Time of 50t Ultra Large Skip in Hulusu Mine
WANG Xu-dong
GUO Jun
HAN Yong-wei
Keywords:hoisting of mine main shaftultra large skipquantitative bucketexternal powered unloadinginactive time
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 8-10 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2013,45(9)