Study on New Technical Experiment of Legless Overpass Crossing over Mine Roadway in Daliuta Mine
CHEN Su-she
Keywords:daliuta minelegless overpassoverpass with legscoal wall platform
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 29-30,33 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2013,45(6)