Design on Auxiliary Water Drainage System of Mine Shaft Bottom in Longgu Mine
LI Shan-hong
WANG Hui
SONG Guo-zhong
Machine-generated Keywords:
Publication Date:2012-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:2( 25-26 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2012,(8)