Rapid advancing technology for fully mechanized longwall mining face passing through synclinal structure
ZHANG Yong-can
LIU Bin
Machine-generated Keywords:
Publication Date:2008-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:2( 54-55 )
COAL ENGINEERING

COAL ENGINEERING

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2008,(1)