Optimized analysis on gateway equipment layout for fully mechanized coal mining face in Shendong mining area
TIAN Rui-yun
Machine-generated Keywords:
Publication Date:2007-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:2( 15-16 )
COAL ENGINEERING

COAL ENGINEERING

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2007,(1)