Optimization on mining techniques for enlarged project of Huolinhe No. 1 Open Pit Mine
MA Pei-zhong
Machine-generated Keywords:
Publication Date:2006-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:2( 5-6 )
COAL ENGINEERING

COAL ENGINEERING

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2006,(5)