Discussing about the main drainage system design of the 1000-meter deep shaft at Tangkou mine
Machine-generated Keywords:
Publication Date:2004-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 15-18 )
COAL ENGINEERING

COAL ENGINEERING

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2004,(4)