Pre-grouting for the working face with reserved rock cap + short section of driving and lining-a method for crossing the rich aquiferous strata at vertical shaft
Machine-generated Keywords:
Publication Date:2004-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 29-31 )
