Calculation of the drainage water hammer for the vertical shaft over 1000 m in depth and the necessary protection measures
Machine-generated Keywords:
Publication Date:2004-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:2( 25-26 )
