Bored spread concrete pile adopted for the foundation in the currently heaped-up subsoil
Machine-generated Keywords:
Publication Date:2003-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 26-29 )
COAL ENGINEERING

COAL ENGINEERING

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2003,(9)