Optimization of the bench blasting design scheme for grade Ⅳ surrounding rock in tunnel
WANG Wenke
SU Xin
Machine-generated Keywords:
Publication Date:2021-12-30
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 16-18,28 )
