Charging and hole arrangement method of pre-blasting engineering in subway shield interval
HUANC Nan
CU Yangguang
Machine-generated Keywords:
Publication Date:2020-09-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 32-34 )
