Research on control measures of deep-buried roadway passing through fault with high water pressure
ZHANG Xiaobing
PAN Xiahui
Machine-generated Keywords:
Publication Date:2021-12-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:9( 97-105 )
