Experimental Study on Loosening Radius of Pre-drainage Borehole by Pre-splitting Blasting for Increasing Permeability at 2306 Working Face of Zhangcun Coal Mine
WANG Yongzheng
Keywords:pre-splitting explosionloosened blasting radiuscontrol holepermeability increasinggas extraction
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
