Optimal Allocation of Bottom Hole Assembly Using in the Construction of Coal Seam Directional Long Drilling
Abstract:According to the factors analysis of influencing drilling track and the prediction of drilling track, combining the coal seam oc- currence features of experimental area, several kinds of angle holding assembly models are designed and tested. The results show that the near - bit of stabilizer and packed hole assembly selected in the test have good straight - keeping function and a certain correcting capacity, which is more suitable for directional drilling. Using different straight - keeping stable compound drilling tools are contribute to control the drilling track.
Keywords:gas drainagebottom hole assemblydrilling trackdirectional long drilling
Publication Date:2012-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 1-3,7 )
Safety in Coal Mines

Safety in Coal Mines

PKUISTIC
ISSN:1003-496X
Year, Vol.(Issue):2012,43(8)