Vertical Shaft Freezing and Outside Wall Fast Construction Technology in SouthAirshaft of Yuwu Coal Industry
Abstract:Fast construction for digging shaft and freezing wall was implemented by using advanced equipment which contained skiphoist,center rotary grasp rock machine,automatic batching system,single-slotted hydraulic stripping overall metal template and forced concrete mixer.Advanced blasting technologies with hole,smooth,weak shock,weak rushed,anti-noise nonel were adopted.Rapid construction with high-quality organization achieved good results.
Keywords:advanced equipmentmetal formsmooth wall blasting