Reliability analysis of the discontinuous technology equipment in Har′er wusu Open-pit MineLUO Huaiting8-11
Analysis of dangerous rock caving along end slope in Har′er wusu Open-pit MineZHANG Shunhong, LUO Huaiting12-15,19
Study on minimum tracing distance of coordinated mining in open-pit coal mineYAO Jianhua, WANG Wei, XU Zhong kui, WANG Guilin16-19
Affecting factors analysis on diesel consumption of transport truck in open-pit coal mineBAI Xuerui20-21,27
Determination of reasonable pressure slope height in coordinated mining of adjacent open-pit coal minesWANG Wei, YAO Jianhua, WANG Guilin, LIU Yufu22-27
Analysis of causes and countermeasures of blasting foundation and bulk in Heidaigou Open-pit Coal MineZHANG Yinliang, YUAN Wenhua31-32,36
Research of construction scheme on Nanpinggou end-slope road in Ha'erwusu Open-pit Coal MineLIU Yu, LIN Xu33-36