Scheme optimization of coal mining in south slope west area of Fushun West Open-pit MineHAN Xiaoji, LI Huifa, FENG Ping1-4,8
Slope stability analysis and control of increased capacity expansion project in Xiaowangzhuang dumpLI Xiaojun9-12,15
Optimization of slope stability of non-working slope expansion in the Open-pit Mine of XinjiangMA Xiyan13-15
Discussion on safe mining technical scheme of shallow coal seam in Guotou Hami No.1 MineWANG Gang16-18,22
Study on improving production capacity of WK - 35 electric shovel in Weijiamao Open-pit Coal MineZHENG Kaihui, ZHANG Yonggui19-22
Determination of initial trenching position based on ideal point method with variable weight in open-pit mineGUO Qiang23-26
Method of improving the recovery rate of raw coal in Fushun East Open-pit MineHUO Mingliang, HAN Wei, BI Rongxing27-29
Application of pipe drilling and grouting technology in water treatment system of Dongming Open-pit Coal MineGUO Xu, WANG Yunchuan, CHEN Junbin, KANG Jiaming, ZHONG Xiaoyong30-33,36
Ditch reverse slope mining technology along coal seam roof in Pingshuo Antaibao Open-pit MineZHAO Tianyou, LIU Changyuan34-36