Coal main road optimization in antaibao open-pit coal mine working faceXU Zhi-yuan, CAI Qing-xiang1-2
Probing into stripping semi-continuous technology optimization in Shengli no.1 open-pit coal mineWANG Qi-rui, CAI Qing-xiang3-4,6
Hazard analysis of water on a surface mine slope and study on harnessing measureJIN Jie-fang, ZHAO kui, XU Zhen-hua7-9
Soil and water erosion prediction of fifths extension projects works of Xiaolongtan mine bureau and prevention and cure measuresRUI Chang-long, CHEN Yong, ZHANG Tian-wen10-11,15
Preliminary discussion on rock slope stability analysis in surface mineWANG Xing-min, NIE Huai-yao, LIU Zhi-ru, SUN Yue-ying, PENG Jian-mou12-15
Preliminary probing into water retaining slope integrated management measure in surface mineZHOU Yong, REN Zhan-ying, WANG Xi-fu20-21,23
Transcension of goaf within Hami open-pit coal mine boundaryXIANG zhao-yang, LIU Peng, FANG Xue-bing22-23