Transformation of the Development-transportation System for No.1 Mining Area East Pit of Heibaoshan Open-pit Coal Mine王英杰, 王永刚4,6
Original Scheme of Road Bank Construction for 2# Earth-disposal Machine of Yuanbaoshan Open-pit Coal Mine李欣东, 李三川5-6
Mining of Beforehand Remain Coal Wall in the Situation of Side-slope Creeping in Lingquan Open-pit Coal Mine王胜华, 杨洪才7-8
Feasibility Research on Enhancing the Final HangingWall Slope Angle of Opencasts刘志斌, 王志宏, 张跃进, 王胜华9-11
Comprehensive Management Measures of No Working Wall 488 Station Side-slope in Pingzhuang Western Open-pit Coal Mine李景堂, 师恩奎, 张信12-13
Premiliary Discussion on the Water-prevention and Water-drainage Design in TIGYIT Open-pit Coal Mine of Burma李静14-15
Prevention and Controlling of Shallow Part Side-slope Underground Water Calamity in Fushun Western Open-pit Coal Mine杨占军, 肖平, 夏寿亮16-17,19
Analysis for the North Slope Deformation of Anjialing Open-pit Coal Mine董洪亮, 段起超, 秦建明, 陈再明, 袁建峰20-21,23