Optimization of anticline east wing extended working line length in Pingshuo Antaibao Open-pit MineZHAO Tianyou, WU Mao1-3,7
Theoretical calculation and guarantee measures of open-pit mine land time cycleHE Changbin, CHANG Yonggang, XU Chang, ZHANG Jiaquan, DENG Youran, CHEN Defu, LI Haichao, YUAN Wenjie4-7
Comprehensive evaluation model for the first mining area trench position based on TOPSIS method in the open-pit mineLIN Lin8-10,14
Length optimization of working line in Nalinmiao hazard control project first areaGU Dongdong, WANG Hua, HU He11-14
Research on technical transformation scheme of dumping system in adjacent areas of open-pit mineYANG Jianbing, LV Shouping, WEI Ke22-24,28
Analysis of oil shale small particles briquetting process in Xinjiang Baoming miningZHU Wenhong, HAN Gang, LI Guang, ZHAO Hongchao, ZHANG Xiaolei33-35