Preliminary Discussion on the Mathematic Model of Matching Piled Aluminium Ore and Powder Mine韦立凡1-3,28
Technical Transformation of 610 Earth-disposing Line in Pingzhuang Open-pit Coal Mine张万龙, 单君, 张国柱, 田宇, 张信4,8
Adaptability of Trolley Used to Chisel Rock Based on Hydraulic Pressure for Blasting Technics of Chiseling Ascending Medium Deep Hole刘鸣, 邢军, 宋守志5-6,16
Analysis for the Blasting Scheme of Earth-reducing and Speed-slowing of the Rock with Epual Character陈亚军, 李览, 谢锋震9-11,30