Investigating into the Reasonable Positioning of Transposition Steps for the Breakage Station of Yuanbaoshan Opencast王喜富, 李仲学, 曾昭红, 李秋新4-5,9
Increasing the Production Capacity of Electric Shovels of Deep-cancove Opencasts With Single Bucket and Track TechnologyYANG Zhan-jun7-9
Reasonable Arrangement of the Long-term Development Planning Output for Fushun Western Open-pit Coal MineGAO Peng10-12
Application of Air Lead-in Concrete to Highway Surface Construction and the ManagementLI Xin-jing16-,18
Waste Disposing Position Adjustment for the Southern Section of No. 3 Pit of Antaibal Opencast林振春, 昝喜山17-18
Studying Spoil-disposing Mode of Overburden-dumper at the Spoil-disposal Site of Heidaigou Opencast王平亮, 王启瑞19-20
Analysis of the Side-slope Stability and Monitoring System in the North-Western Wall of Antaibao Opencast昝喜山, 林振春24-25