Application of combined pre-splitting initiating explosive column in east open-pit mine slope pre-splitting blastingYE Xinrong, QI Maofu, LIU Xiaoming1-2,6
Application feasibility of wired auxiliary double dynamical truck transportation in Anjialing open-pit mineDING Xinqi, CHEN Defu3-6
Underground goaf safety mining practice in open-pit mine compound mining realmLIU Xianquan, XU Zhiyuan7-9
Evolution process of slope engineering system in open-pit mine王来贵, 习彦会, 刘向峰, 赵娜, 宋子岭, 王建国, 纪玉石, 王振伟, 朱新平10-14,19
Research on slope alteration sandstone disintegration test and fractal characteristics in open-pit mineLI Yanze, QI Yujun, MIAO Tieliang, GAO Jian15-19
Lap joint and shift way of belt conveyor and end slope belt conveyor in working faceLIU Yongjie, WANG Zhaogang, ZHU Guofeng20-23
Slope monitoring scheme of Muli open-pit coal mine in permafrost regionsZHANG Baolong, XU Shuanhai, ZHANG Weidong, ZHANG Honggang, WU Boqiang24-26
Collapse column region boundary scheme in the middle of stope in Anjialing open-pit mineDENG Youran, CHEN Defu, WEI Hua27-29,32
Application of geophysical prospecting in Pingshuo east open-pit mine goaf explorationLIU Yonggang, CAI Guangqi, HAN Jin30-32