Optimization analysis of continuous coal mining process layout in open-pit mine wheel bucket
LIU Wenfang
WEN Yu
WANG Jian
Abstract:To address problems such as safety risks and low efficiency stemming from excessive semi-continuous and intermittent processes in high-capacity open-pit mining operations,on the basis of analyzing the current status of wheel-bucket continuous coal mining process domestically and internationally,by qualitative and quantitative analysis of the wheel-bucket continuous coal mining process,we establish a mathematical model to evaluate the economic benefits of replacing traditional semi-continuous processes with continuous ones,considering the costs of phasing out semi-continuous processes,investments in continuous process,and subsequent process maintenance.We obtain a generalized economic model applicable to the wheel-bucket continuous coal mining process.Taking the second mining area of Xingsheng Open-pit Mine as a case,assuming the first coal seam thickness of 29 meters and a mining depth of 100 meters,the economic benefit of replacing the semi-continuous process with continuous process is 80.2 million yuan.
Keywords:open-pit minecontinuous coal mining processprocess optimizationgreen miningmathematical model
Publication Date:2026-02-28
Online Publishing Date:2026-03-19(First online date of this platform, not the publication date of the document)
Pages:6( 66-71 )