Optimization design of slope monitoring system in Manglai Open-pit Coal Mine
SHI Lei
Abstract:In order to solve the problems and shortcomings of the existing monitoring system in Manglai Open-pit Coal Mine and achieve full coverage of monitoring,based on the existing geological data and actual on-site operation conditions,referring to relevant monitoring standards and specifications,the article determines monitoring level of the slope in Manglai Open-pit Coal Mine excavation and disposal site,and determines corresponding monitoring methods and projects Through determining the reasonable monitoring thresholds,the article optimizes and designs the existing monitoring system.the optimized monitoring system can achieve full coverage of the entire mine monitoring.
Keywords:slopemonitoring systemmonitoring grademonitoring methodmonitoring threshold
Publication Date:2024-12-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 53-56 )
Opencast Mining Technology

Opencast Mining Technology

ISSN:1671-9816
Year, Vol.(Issue):2024,39(6)