Application and analysis of reducing cost and increasing efficiency measures for deep hole blasting
LYU Wenwei
Abstract:In order to realize the cost reduction and efficiency increase of deep hole blasting project,taking Ha'erwusu Open-pit Coal Mine as the engineering background,the article analyzes the cost composition of production and blasting engineering in open-pit coal mine,puts forward AEO management method,parameter optimization and intelligent construction.The results applied to the production site show that the cost reduction and efficiency increase measures not only improves the safety management level and blasting quality,also improves the level of professional skills of workers.
Keywords:deep hole blastingreducing cost and increasing efficiencyAEO management methodparameter optimizationintelligent construction
Publication Date:2024-02-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 84-87 )
Opencast Mining Technology

Opencast Mining Technology

ISSN:1671-9816
Year, Vol.(Issue):2024,39(1)