Technical measures to reduce blasting boulder rate of open-pit mine with structural plane development
WANG Xiao
ZHANG Xiaohua
ZHAO Yuechao
SU Xiaojia
YANG Yaming
WANG Ke
Machine-generated Keywords:
Publication Date:2020-12-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 52-55 )
