Slope stability analysis and control measures of soft base dump in Open-pit Mine
HOU Chengheng
Machine-generated Keywords:
Publication Date:2020-08-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 1-4 )
