Slope stability analysis and control countermeasure of dump in Pingshuo East Open-pit Mine
WANG Yantao
GE Shanfeng
LI Shenglong
Machine-generated Keywords:
Publication Date:2020-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 47-51 )
