Spiral drum of circulating water system transformation analysis
Du Xin
Abstract:With the development of mining drawdown in Fushun East Open-pit Mine, the coal preparation plant appears insufficient phenomenon in a clean water supply. The slime water of factory emissions cannot get full sedimentation and contain the recycled resources. A large number of erosion can cause pollution to the surrounding environment, which causes economic losses to the enterprise. This article introduces the production process of circulating water system transformation method.
Keywords:water sourcecoarse slimeclosed cyclerecycling
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 66-68 )