Modification optimization of 68 station in Fushun East Open- pit Mine
CHEN Jiwang
LU Bing
ZHANG Decang
MA Zhilong
SUN Kai
Abstract:Fushun East Open-pit Mine currently uses the way of railway development, mining technology for single bucket excavator railway mining technology. 63 station is large station yard in east open-pit mine, which moves northward about 80 meters following mining area, and sets up a large amount of engineering each shift. Therefore, 63 station long-term shift is very important.
Keywords:electric iron transportationstation field shifttransportation efficiency
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 28-30 )

ISSN:1671-9816
Year, Vol.(Issue):2016,31(10)