Several problems of dumping plough application in modern open-pit mine stripping system
CHEN Dawei
Abstract:The article analyzes the present situation of dumping plough in modern open-pit mine stripping system from the aspects of dumping plough classification, main technical performance parameters. The author discusses the methods and steps of initial embankment construction and "dead end" treatment methods in dumping.
Keywords:dumping ploughopen-pit minestripping systeminitial embankment"dead end"
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 4-6 )

ISSN:1671-9816
Year, Vol.(Issue):2016,31(10)