Reconstruction of boiler flue gas system in Shengli East No.2 Open-pit Mine industrial field
WANG Aiai
Abstract:According to the emission status of boiler room flue gas and boiler operation characteristics in Shengli East No.2 Open-pit Mine industrial field, the mine carries out reconstruction from desulphurization and denitration, dust removal three aspects in terms of the local environmental monitoring data and standard. According to the calculated efficiency and site area, investment and many other factors, the mine comprehensively chooses the suitable process and equipment of this project.
Keywords:open-pit coal mineboilerpollutantdesulfurization and denitrification
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 61-64 )