Stripping semi-continuous system belt conveyor tract layout optimization in Shengli East No.2 Mine
BAO Hui
WANG Shougong
YAO Gelin
Machine-generated Keywords:
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 16-19 )
Opencast Mining Technology

Opencast Mining Technology

ISSN:1671-9816
Year, Vol.(Issue):2015,(6)