Resource-Constraints Based Optimization Scheduling Approach for Concurrent Activities
Abstract:A resource-constraints based optimization scheduling approach is proposed for concurrent product development process. First of all, three definitions for concurrent activities are given. Then an integrated function is proposed in the algorithm for optimization scheduling. Two critical items in concurrent engineering-role allocation and feedback revision are also addressed. Simulation results show feasibility of the algorithm.
Machine-generated Keywords:
Publication Date:2001-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 847-850 )
