Discussion on the applicability of prediction methods for mine water inflow
Lyu Yuguang
Zhang Qiang
Lyu Wenqing
Abstract:To identify a more effective method for predicting water inflow in production mines,this study first examines the"large well"conceptual model.The formation of"large wells"in coal mines typically requires several decades,making it difficult to obtain time-dependent groundwater parameters.Additionally,the Gal empirical formula relies on limited parameters and is prone to overextension,resulting in high prediction errors ranging from 84%to 398%.Recognizing that mine water inflow over time reflects the site's hydrogeological conditions,this study introduces the potential line method for water inflow prediction.By calculating the water-rich coefficient based on updated inflow data,the accuracy of predictions improves compared to traditional methods.Using a case study of a single mine,water inflow was predicted using both the water-rich coefficient method and the trend line method.The relative errors for these approaches ranged from 14.2%to 17.3%.Overall,the large well method is best suited for the early stages of mine design and initial production.For ongoing operations,the water-rich coefficient method or trend line method is recommended,provided that water inflow data is collected continuously and comprehensively.
Keywords:mine water inflow predictionlarge well methodwater enrichment coefficient methodtrend line methodwater inflow accounting logapplicability
Publication Date:2026-02-28
Online Publishing Date:2026-03-25(First online date of this platform, not the publication date of the document)
Pages:7( 178-184 )
