Integrative Evaluating Method of Equipment Operational Availability in Development Phase
LU Lei
YANG Jiang-ping
Keywords:operational availability evaluationArena simulationLatin hypercube samplingregression tree
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 13-16 )