Mechanical analysis and material preparation of ultra-high-strength base asphalt pavement
TAN Bo
ZHENG Gang
LI Qing
XIE Enlian
LIU Jingshuang
Abstract:Objectives To improve the structural performance of asphalt pavement and achieve low-carbon goals,an AC+ultra-high-strength base asphalt pavement structure is proposed to reduce the thickness of the asphalt pavement structurue.Methods Bisar software was used to analyze the mechanical response of the ultra-high-strength base pavement structure,proposing the design parameters for the asphalt pavement structure and ultra-high-strength base material.Orthogonal experimental design was then conducted to ana-lyze the influence of silica fume,fly ash,and cement-sand ratio parameters on the mechanical properties of the ultra-high-strength base material.Range and variance analysis were performed to determine the opti-mal mix proportion.Finally,the bonding performance between asphalt layers and the ultra-high-strength base layer was evaluated through splitting tensile tests using five methods:spreading crushed stones,brush-ing grooves,epoxy resin,spraying modified asphalt,and rubber asphalt.Results The results show that when the thickness of the ultra-high-strength base is 0.08 m,with an elastic modulus of 40 GPa,the total thickness of the structure is 0.52 m.The fatigue cracking life of the asphalt mixture and inorganic binder layers in the ultra-high-strength base asphalt pavement is higher than that of a conventional asphalt pave-ment with a total thickness of 0.74 m.The optimal mix ratio for the ultra-high-strength base material is 13%silica fume,11%fly ash,a cement-sand ratio of 0.8,and a water-cement ratio of 0.25.The splitting tensile strength tests indicate that epoxy resin provides the best bonding,followed by crushed stone,and rubber asphalt provides the weakest bonding.Conclusions Under reduced pavement thickness,the AC+ultra-high-strength base asphalt pavement performs better than conventional asphalt pavement.This study proposes a low-carbon and cost-effective asphalt pavement structure and material preparation method.The interlayer bonding performance between the asphalt surface layer and ultra-high-strength base layer is ana-lyzed,and the use of spreading crushed stones is recommended,providing a new feasible approach for composite asphalt pavement.
Keywords:composite pavementultra-high-performance concreteorthogonal testmix proportion designinterlayer bonding
Publication Date:2025-04-27
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:9( 186-194 )
Journal of Henan Polytechnic University(Natural Science)

Journal of Henan Polytechnic University(Natural Science)

ISTICPKU
ISSN:1673-9787
Year, Vol.(Issue):2025,44(2)