The study on optimized arrangement of microsemeism monitoring system and its application in 11th mine of Pingdingshan coal mining company
Abstract:According to mining scheduling of diphead panel of J2 in 11th Mine of Pingdingshan,technology of rockburst time and site prediction were presented;Key control area of rockburst was determined.Monitoring system of rockburst was optimized.14 underground stations and 2 ground stations were installed.Characters of frequency spectrum and energy were analysed according to rockburst records.The results revealed that the shock close to rockburst site was wider and larger energy;Shocks with low energy can loose energy;Silent period of roacburst energy would happen before strong rockburst.Therefore prevention system of strong rockburst was established,and control measures were proposed.
Keywords:rockburstmicrosemeismoptimized arrangementmonitoring system
Publication Date:2011-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 279-282 )
