Modeling and Solving of Integrated Planning for Thermal Power Plants
LIU Cong
Abstract:As a typical representative of clean energy,wind energy has been widely used,but the problem of abandonment is becoming more and more serious. Due to the thermoelectric coupling relationship of heat and power plant units,the main reason for the abandoned air supply is to increase the output of power plants and to occupy the net space of wind power in order to ensure the heating in winter. To solve this problem,this paper puts forward through the cooperation of the heat and power plant unit in thermal power plant,improves the peaking capability of the unit to improve the comprehensive plan of wind power utilization power plant. According to the operation relationship of heat source and thermal power unit,considering the investment cost and profit of heat source,the comprehensive planning scheme of thermal power plant is modeled. Through the example analysis,the applicability of various model solving methods is discussed,and the most suitable solution algorithm is obtained. Finally,the reasonable allocation capacity of heat source under various planning schemes is obtained,which provides a reference for comprehensive planning of ther?mal power plants.
Keywords:wind powerdistrict heatingheat sourcecogenerationcomprehensive planning
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 799-805 )
