System simulation of a 0.3 MWth CFB coal-fired pilot facility based on Aspen Plus scheme
MING Xiangdong
DUAN Yufeng
LIU Shuai
HU Peng
Machine-generated Keywords:
Publication Date:2020-05-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:8( 38-45 )
Clean Coal Technology

Clean Coal Technology

ISTIC
ISSN:1006-6772
Year, Vol.(Issue):2020,26(3)