Winter Construction Practices of 1000 m Deep Mine Shaft in Freezing Cold Mining AreaZHAO Ming-xiang1-4
Design on Construction Organization of Over 1000 m Depth Mine ShaftJI Ming, WANG Zhen, YANG Ben-sheng5-8,38
Practices on Rapid Construction of Super Large Cross Section Chamber in Underground MineYANG Jin-jun, HAN Tai-ran, LI Ting-bao, YANG Kai, JIN Li-bin13-15
Surface Ground Nuclear Magnetic Resonance and Transient Electromagnetic Combined Detection Technology Applied to Detection of Water in Goaf of Mining AreaLIU Jun16-18,15
Construction of Mine Roadway Passed through Broken Zone of Fault in Hongqingliang MineWANG Su-long, ZHANG Tian-cang19-21
Research on Stress Measurement of Double Liners in Mine Freezing ShaftZHONG Zhan-liang, WANG Jian-ping, GUAN Zeng-lun, LIU Xiao-min, YANG Wei-guang, WANG Kai22-25
Mechanics Features Analysis and Optimized Design of Loading Device Applied to Test of New High Strength Mine Shaft LinerLI Xin-xin, RONG Chuan-xin, WANG Bin26-30
Study on Mechanism and Experiment of High Pressure Carbon Dioxide Blasting and Permeability Improved TechnologyZHAN De-shuai, HUANG Liang-gao, QIU Tian-de31-34
Experiment Study on Cement Adhesive Powder Bound Loess Applied as Backfill Material of Mine GoafFENG Cheng-gong, GAO Gang-rong, ZHANG Tian-cang35-38