Back Grouting and Water Sealing Technology for Mine Auxiliary Shaft Lining in Shoushan No.1 MinePei Dawen, Xu Jimin2-3
Outer Wall Failure Treatment for Ground Freezing Section of Mine Main Shaft in Getting MineLi Jiqiang, Ding Yajun, Zhuang Lihui4-5,9
Grouting and Water Sealing Technology for Mine Shaft Sinking through Water Flooded GoafLiang Zujun, Li Xuefeng6-7,11
Comprehensive Water Prevention and Control Technology for Mine Main Shaft Construction of Shoushan No.1 MineXu Jimin, Pei Dawen8-9
Winter Construction Technology for High Strength Pre-made Concrete Shaft Tubing Segments of Mine Main Shaft in Longgu MineGu Chengdong12-13
Practices on Rapid Construction of Freezing Section in Mine Main Shaft of Panbei MineLiang Xiao14-15,25
Research on NC-H High Efficient Blending Material and Application to Mine Construction王谦, 王锦明, 鲁统卫, 简会颖16-18
Cause and Prevention Measures of Fissure Occurred on Large Volume Concrete after Moulds Removed in High Cold AreaHuang Mingqi, Wang Weiming, Yue Qiang22-25