Complete Set of Construction Technology for Large Diameter and Super Depth Vertical ShaftBIAN Zhenhui1-6
Hydrology Characteristics Analysis and Water Inflow Prediction of First Mining Area in Nalinhe No.2 Coal MineYAN Jianhua7-12
Study on Setting Waterproof Coal (Rock) Pillar for 13-1 Coal Seam under Thick Alluvium of East No.3 Mining Panel in Liuzhuang Coal MineDU Shaoneng20-24,44
Technology of Rapidly Cutting-off and blocking-off Water Flow by Grouting in Vertical Diversion ChannelsZHU Mingbao, NIU Guangliang25-28
Study on Intelligent Decision Support System of Mine VentilationFU Wenjun, YANG Fuqiang, NI Jingfeng, AN Huidong, YANG Jian29-32
Application on Ultrasonic Detection Technology of Predication for Freezing Wall Extending Speed in Silty-fine Sand StratumZHANG Jiwei, ZHENG Xinyun, HAN Yufu33-36
Study on Deformation Law and Stability of Freezing Wall of Main Inclined Shaft in Yuandatan MineZHAO Jian, YANG Jinhong, LIU Leibin, CHENG Yubo37-40,52
Deformation Failure and Stability Control of Open-off Cut with Soft and Weak Mudstone RoofYANG Yong, XIE Fuxing41-44