60 Years Science and Research Achievements of Mine ConstructionLIU Zhiqiang, HONG Boqian, LONG Zhiyang1-6
Packer High Pressure Grouting Technology Applied to Floor Heave Control Occurred in Mine High Geostress RoadwayZHANG Yuanbao, WANG Chuanbing, HOU Junling18-21
Study on Particle Size Distribution Law of Rock Cuttings by Inserted Rolling CuttersFANG Shisheng, ZENG Zhiyuan, MENG Yiping, LIU Zhiqiang, TAN Hao, HAN Bo28-31
Research and Application on Mechanics Performances of Dry Shooting and Quick Setting Mortar in Deep Mine RoadwayWANG Xiaojian, SONG Haiqing32-34,44
Study on Excavation Space Effect of CD Construction Method Applied to Tunnel Expanded from Two-Lanes to Four-LanesSHU Zhonglei, LIN Congmou, CHANG Fangqiang35-38,50