Rapid Construction Technology of Mine Shaft Passed through Oil Shale StratumLI Gang, WANG Yu-han1-3,24
Grouting and Water Sealing Construction of 1000 m Mine ShaftLU Xing-yi, WU Yong-qi, ZHANG Hong-jie8-10,37
Practices on Construction of Three 1000 m Depth Mine Shafts in Jinchuan Mining AreaZHENG Jian-xin, ZHAO Ming-xiang, ZHANG Jun-wen11-13,28
Grouting Technology Applied to Construction of Mine Inclined Shaft Passing through Falling Zone of SinkholeCHEN Xi-suo, CHEN Bo, LI Zhong-hua18-20
Reinforced Technology of Mine Shaft at Seam Opening Section of Mine Shaft in Huainan Mining AreaSUN Shi-yuan, LI Xiang21-24
Numerical Analysis on Rock Breaking with Spherical Inserted Rolling Cutters of Raise Boring MachineMENG Yi-ping, WANG Ying-ying, TAN Hao29-33
Study on Site Measurement of Freezing Wall and Mine Shaft Liner Temperature Field in Watery Thick Soft Gravel LayerGONG You-chang, GUO Lei, CHEN Hong-lei, JIANG Guo-jing34-37