Improvement of Reinforced Bar Mesh/Shell Bolt/Shotcreting Technology in Mining Activity Pressurized Area蒋雪华, 金江涛, 廖万生, 刘传波, 荣联凤11-13
Construction Method Cross Through Fault Broken Zone of Ventilation Shaft of Liangbaosi Mine赵逢进, 李文生, 陈祥谦16-17
Pre-grouting Technology at Working Face Applied to Construction of North Ventilation Shaft in No.12 Mine of Pingdingshan Coal Mining Group Corporation董新峰18-19,17
Applied Research on Arch Cross Section and Different Bolts in Support of Large Span Broken Seam Gateway王晓利, 张柯20-22,13
Analysis Elastic and Plastic Value of Maximum Loading for Artificial Frizzing Ground Foundation王贵虎, 周红, 宋学成23-26
Simplified Calculation on Inner Loading of Reinforced Bar Shotcreting Layer Structure雷金波, 姜弘道, 郭兰波27-32