Pre-Grouting Technology of Working Face with High Angle Crack and Crack Water Bearing Zone蒋网丁, 张斌, 杨忠玉8-10
Experiment Study on Anti Crack Performance of High Strength and High Performance Concrete for Deep Freezing Mine Shaft Liner鲁统卫, 郭蕾, 王谦15-19
Study on Key Technology for Fully Mechanized Top Coal Caving Mining Face Passed through Fault under Complicated Geological Conditions吕兆海, 赵兴军20-22,28
Application of Roof Separating Meter to Monitoring and Measuring Roof Stability of Mine Roadway郭相参, 张爱英, 李密23-24,32